Wednesday, January 18, 2006

60' Geodesic Dome 20051101 Rising2


Still Prior to Dawn
Our Dear Friends are Watching Us from Top of Burm
Triangles in Foreground Posted by Picasa

Double Dome Sunrise 20051101 60'Rising2


Early Morning With Heavy Frost 20051101 Rising2 - First Row of Struts Supported by the Hub Riser Corner Assemblies
 Posted by Picasa

60' Geodesic Dome Sunset 20051101 60'Rising2


60' Geodesic Dome 20051101 Rising2
Nearly Sunset
Completed Half of First Row of Struts Posted by Picasa

60' Geodesic Dome Sunset 20051101 60'Rising2


The Sunset Highlights Our 7 Window View
The Bottom Rectangles will be Filled with Stud Walls Posted by Picasa

60' Geodesic Dome Sunset 20051101 60'Rising2


29' Dome Extension is Joined by 60' Dome Shell Showing How Closely the Structure of the Two Domes Merge Together Posted by Picasa

60' Geodesic Dome 20051102 Rising3


Maazo Caught on Scaffold with New Hoist Assembly  Posted by Picasa

Double Dome Sunrise 20051102 60'Rising3


Our 60' Dome is Rising:
29' Dome and Extensions Are Clearly Attached
see http://photos1.blogger.com/img/276/6312/640/Mdp7aEast.jpg for Actual Plan
 Posted by Picasa

60' Geodesic Dome 20051103 Rising4


Scaffold Prepared for Next Row of Struts
Shelf at Lower Level Holds Struts and Pins
as well as Tools and a Winch for the Strut Hoist  Posted by Picasa

60' Geodesic Dome 20051103 Rising4


Twilight With First Row of Struts Completed
This Allowed Hub Riser Corner Assemblies
to be Adjusted to Plum Sequentually Around the Dome  Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Exterior View of Hub Encircled
by Colors of Painted Struts L-K-J-M Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Exterior View of Riser Wall wih 2x8' Studs Posted by Picasa

Double Dome Sunrise 20051104 60'Rising5


Double Dome Sunrise 20051104 60'Rising5
 Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Maazo Caught on Scaffold with New Hoist Assembly
 Posted by Picasa

60' Geodesic Dome 20051104 Rising5


John is Working Alone Today
Installing Riser Wall Exterior Studs 2x8'
Gerry's Shop Where Dome Components were Fabricated is Visible to Rear  Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Interior View of Riser Wall Corner Assembly Built from Five 2x8'  Posted by Picasa

60' Geodesic Dome 20051104 Rising5


John Continues Filling Risers 11 - 12 at South Side Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Maazo Installing Modified Hoist Assembly Replacing ComeALong with Scaffold Parts
 Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Mnt Lamborn Behind John Cutting Riser Wall Stud from Used Footer Form
 Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Bounty Checks Wood Pile as John Nails Studs Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Scaffold Crane was Successful as John and Maazo Installed 8 Struts on Second Row  Posted by Picasa

60' Geodesic Dome 20051104 Rising5


Another Sunset with 60' Dome Rising Above 29' Dome Posted by Picasa

Double Dome Sunrise 20051105 60'Rising6


Double Dome Sunrise 20051105 60'Rising6  Posted by Picasa

60' Geodesic Dome 20051105 Rising6


Maazo Hangs Off Dome Structure While Hammering Pins Posted by Picasa

60' Geodesic Dome 20051105 Rising6


John Braces Next Level of Scaffold
while Maazo Secures Hoist Assembly at Higher Level Posted by Picasa

60' Geodesic Dome 20051105 Rising6


Laura Packed Struts and Stacked Them Alphabetically
she is going for more in the background  Posted by Picasa